EasyManuals Logo

Siemens SCALANCE XC-200 User Manual

Siemens SCALANCE XC-200
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #43 background imageLoading...
Page #43 background image
Mounting
4.5 Installation on a standard S7-1500 rail
SCALANCE XC-200
Operating Instructions, 07/2016, C79000-G8976-C442-01
43
4. When you tighten the knurled screw. you cannot release the securing bar (torque 0.5
Nm). The device is additionally fixed.
5. Connect the electrical connecting cables, refer to the section "Connecting up (Page 47)".
Removal
To remove the device from a standard rail, follow the steps below:
1. Disconnect all connected cables.
2. If necessary, loosen the knurled screw with your hand or a screwdriver.
3. Lever the securing bar down using a screwdriver as far as it will go.
4. Remove the device from the mounting rail with the bar pulled.

Table of Contents

Other manuals for Siemens SCALANCE XC-200

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SCALANCE XC-200 and is the answer not in the manual?

Siemens SCALANCE XC-200 Specifications

General IconGeneral
BrandSiemens
ModelSCALANCE XC-200
CategorySwitch
LanguageEnglish

Related product manuals