EasyManua.ls Logo

Siemens SIMATIC CloudConnect CC7 Series - Page 46

Siemens SIMATIC CloudConnect CC7 Series
150 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation, wiring, commissioning
3.4 Commissioning
SIMATIC CC7
46 Operating Instructions, 10/2019, C79000-G8976-C503-02
To insert the CLP, follow these steps:
1. Turn off the power to the gateway.
2. Insert the CLP in the slot.
The CLP can only be inserted in one position.
3. Switch on the voltage again.
The behavior of the gateway depends on the status of the CLP:
CLP unformatted (factory state):
The gateway starts up with its internally saved configuration data.
CLP formatted by a gateway - CLP without configuration data:
The gateway starts up with its internally saved configuration data and saves them to
the CLP.
CLP formatted by a gateway - CLP with valid configuration data:
The gateway starts up with the configuration data stored on the CLP.
CLP used in a different device type before:
The gateway starts up with its internally saved configuration data.
Removing the CLP
1. Turn off the power to the device.
2. Insert a screwdriver between the front edge of the CLP and the slot and remove the CLP.
Diagnostics
Malfunctions of the CLP are signaled by diagnostic messages.

Table of Contents

Related product manuals