4
4-6
Working with S5-DOS/ST
C79000-G8576-C760-03
The PG is switched off.
PG - PLC Connection with connecting cable (6) direct or via (5),
(7) or (8):
The V.24/TTY converter (Köster box) is configured as described in
Chapter 8 V.24/TTY Converter (Köster box).
1. Establish the connection between the COM 1 port of the PG
and the Köster box using the connecting cable (5).
2. Plug the connecting cable (7) or (8) into the 25-pin socket on
the Köster box and establish the connection to the PLC.
3. Screw or clip the connectors in place for safety.
Connecting cable (5), order no. Köster 224 22x
2)
Connecting cable (6), order no. 6ES5 734-1BD20 (length 3.2m)
Connecting cable (7), order no. 6ES5 731-0xxx0
1)
Connecting cable (8), order no. 6ES5 731-1xxx0
1)
1)
xxx
is
the
length
key.
The
cables
are
available
in
lengths
ranging
from
1m
to
1000
m.
Please
refer
to
the
Programmers
catalog
ST 59
for
details
on
the
length
key.
2)
x
stands
for
the
connector
type
of
the
PG
-
Köster
box
connecting
cable
(see
Chapter
8,
page
0-2).
Connecting a PG
with a V.24 Port to
a PLC
Connecting Cables
for a PG with a
V.24 Port
Installing Hardware