Procedure
1. Tap on "START FULL VERIFICATION". A full verication consists of transmitter test, insulation
test and coil circuit test.
– You can also start a partial verication by switching to the "Verication" tab. No
certicates can be generated on partial verications.
A test report in CSV le format can be saved locally, for partial as well as full verications.
2. Wait for the verication to nish. During the verication process the owmeter turns ON and
OFF multiple times. At the end of the verication the owmeter turns OFF.
3. Tap on "DISPLAY RESULTS". Wait for the results to be displayed.
4. The verication result is displayed. Scroll down through the results and tap on "SAVE DEVICE
DATA".
Operating
7.3Starting a verication and generating a certicate or report
SITRANS Vericator
Operating Instructions, 03/2024, A5E51481698-AA 33