EasyManua.ls Logo

Siemens SITRANS FMT020 - Page 33

Siemens SITRANS FMT020
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
1. Tap on "START FULL VERIFICATION". A full veri󹪝cation consists of transmitter test, insulation
test and coil circuit test.
You can also start a partial veri󹪝cation by switching to the "Veri󹪝cation" tab. No
certi󹪝cates can be generated on partial veri󹪝cations.
A test report in CSV 󹪝le format can be saved locally, for partial as well as full veri󹪝cations.
2. Wait for the veri󹪝cation to 󹪝nish. During the veri󹪝cation process the 󹪞owmeter turns ON and
OFF multiple times. At the end of the veri󹪝cation the 󹪞owmeter turns OFF.
3. Tap on "DISPLAY RESULTS". Wait for the results to be displayed.
4. The veri󹪝cation result is displayed. Scroll down through the results and tap on "SAVE DEVICE
DATA".
Operating
7.3Starting a veri󹪝cation and generating a certi󹪝cate or report
SITRANS Veri󹪝cator
Operating Instructions, 03/2024, A5E51481698-AA 33

Related product manuals