Chapter 2: Install the server hardware 20
Chapter 2: Install the server hardware
This section contains the following topics:
•
About electrostatic discharge
•
Shipping carton contents
•
Hardware not supplied in the shipping carton
•
Install the server in a rack
•
Connect the power cables
•
Connect the network cables
•
Power on the server
Installing the server hardware involves unpacking all hardware components, installing the enclosure in
a rack, connecting the power and network cables, and powering on the server.
After installing the server, you then use UCS Manager (UCSM) to add the system to your UCSM
environment.
About electrostatic discharge
You must protect sensitive hardware from electrostatic discharge (ESD), which can damage electronic
components.
■ Ensure the server hardware is fully grounded at all times to prevent damage from electrostatic
discharge.
■ When not installed in a rack, server hardware must be stored in its original packaging or placed on a
sturdy surface that is protected from electrostatic discharge.
■ When handling server hardware components, always use the electrostatic wrist strap provided, or
use a similar form of ESD protection.
Shipping carton contents
The shipping carton contains some standard items while other items are included based on your
configuration.
Part Description
Server enclosure Provides processing power and storage capacity.
Bezel Protects the SSD and HDD drives in the front panel.