36
3059
23 2024
-
PJC 221 & 222
Control Panel Cable Installation
• All Sleipner control panels can be used in any combination.
• All control panels can be installed using:
• Y-connectors - for standard on/off
• T-connectors - for S-Link proportional power system.
(NB: If two or more control panels are operated at the same time in opposite directions, the electronic control box will stop the thruster until
it receives a single signal or thrust in one direction.)
• Sleipner on/off equipment it is entirely “plug & play” and require no additional confi guration setup.
See the Control panel manual for more information.
MC_0041
! Please refer to the graphic for special considerations relating to your model !
MG_0061
-
-
(SEP model)
-
blackblack
+
red
B+
+
red
B+
black
+
red
B+
-
+
-
blackblack
+
red
B+
+
red
B+
black
+
red
B+
-
+
B+
-05M
-05M
5A
+12/24
5A
+12/24
PPC
PJC 212
Proportional
joystick
control panel
Bow and stern
Station 1
S-
PJC 212
Observe PPC battery
terminal polarity !
S-
S-
+12/24V
5A
S link on/off
switch
red
yellow
black
12/24V12/24V
Stern thruster
battery
Bow thruster
battery
Bow thruster Stern thruster
(SEP model)
blackred
B+
black red
Fixed multicable 5m/ 6 1280
5A
+12/24
5A
+12/24
PPC
Proportional
Power Controller
Proportional
Power Controller
Automatic Main Switch
8977 12 / 8977 24
or
Manual main switch
w/ANL fuse
Automatic Main Switch
8977 12 / 8977 24
or
Manual main switch
w/ANL fuse
link co ntrol system
End terminator
End termi
nator
link supply
link e xternal
switch interface
and remote
(optional)
S-link external
switch interface
and remote
(optional)
S-link external
switch interface
and re mote
(optional)
S-link external
switch interface
and re mote
(optional)
Proportional
joystick
control panel
Bow and stern
Station 2
8730
8730
Fixed multicable 5m/ 6 1280