EasyManua.ls Logo

SMA SUNNY BOY 1.5 - Page 60

SMA SUNNY BOY 1.5
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Ensure that no voltage is present at the DC
inputs on the inverter using a suitable measuring
device.
8. Loosen the swivel nuts.
9. Loosen the screws of the connection cap and
remove the connection cap.
10. Use a suitable measuring device to check that no voltage is present at the AC connector
between L and N and between L and the grounding conductor. To do so, insert the test probe
(maximum diameter: 2mm) into each round opening of the connecting terminal plate.
11. Release and disconnect the AC connector using
the sliders located on the side.
1
1
2
10Disconnecting the Inverter from Voltage Sources
SMA Solar Technology AG
Operating ManualSB15-25-1VL-40-BE-en-1160

Table of Contents

Other manuals for SMA SUNNY BOY 1.5

Related product manuals