EasyManua.ls Logo

SMC Networks HRS050-A*-20 Series - Emergency Measures

SMC Networks HRS050-A*-20 Series
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HRX-OM-O021
Chapter 1 Safety Instructions
1.6 Emergency Measures HRS Series
1-8
1.6 Emergency Measures
When emergency conditions such as natural disaster, fire and earthquake,
or injury occurs, turn off the power supply switch. The switch is located at
the front of the product.
1. Turn off the power supply switch at the back of the product to stop the operation of the
thermo-chiller.
Fig. 1-5 Location of the switch for the power supply
2. Be sure to shut off the breaker of the facility power supply (the power supply of the
user’s machine).
Fig. 1-6 Shut off of facility power supply
Even when the power supply swich is turned off, some of the internal
circuits are still energized, unless the user’s power supply is shut off.
Be sure to shut off the breaker of the user’s power supply.

Table of Contents

Related product manuals