EasyManua.ls Logo

Smipack BP700 - Maintenance and Repairs; Nature and Frequency of Maintenance Checks and Operations

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
85/282
ENGLISH
Use and maintenance manual ßP700
ATTENTION!
Before begining any type of maintenance operation indicated in this chapter,
unless otherwise required, switch off the machine, switch voltage off acting on
the main switch, pull out the power supply cable from the mains and disconnect
the tube that feeds the pneumatic plant.
7.1 NATURE AND FREQUENCY OF MAINTENANCE CHECKS AND
OPERATIONS
Tab. 7.1.1
DAILY MAINTENANCE CHART (12 HOURS OF WORKING)
WORKING
SURFACE
CLEAN CAREFULLY TO GUARANTEE AN
EFFORTLESS FLOW
SEALING UNIT
CLEAN THE BLADE WITH COMPRESSED AIR
REMOVE THE RESIDUES OF FILM STUCK ON THE
CONTRAST
PROTECTIONS
CLEAN WITH SOFT CLOTHS AND WARM WATER
MAKE SURE THAT THE SAFETIES ARE WORKING
CORRECTLY
GENERAL
CLEANING
TURN OFF THE MACHINE VOLTAGE
USE WARM WATER WITHOUT PRESSURE AND
MAKE SURE YOU DO NOT DIRECTLY SPRINKLE ON
THE ELECTRIC AND ELECTRONIC COMPONENTS
CAUTION! DO NOT LEAVE WATER RESIDUALS ON
THE MACHINE
DRY THE MACHINE WITH LOW AIR PRESSURE
USE SOFT CLOTHS TO DRY THE MACHINE IF IT IS
STILL WET
7. MAINTENANCE AND REPAIRS

Table of Contents

Related product manuals