PowerMagic 400V C&I Energy Storage System User Manual
32
The bottom of the pit for the equipment foundation must be compacted and filled.
Equipment foundation excavation is strictly prohibited after soaking water disturbance, if
soaking water disturbance should continue to excavate and refill.
Equipment foundation and cabinet contact surface level error 3mm.
Foundations must be above the local historic high water level and at least 300mm above
grade.
Construct drainage facilities in conjunction with local geological and municipal drainage
requirements to ensure that water does not accumulate at the equipment foundations. The foundations
should be constructed to meet the local historical maximum rainfall drainage requirements, and the
discharged water needs to be treated in accordance with local laws and regulations.
When constructing equipment foundations, it is necessary to consider the cable outlet of the
energy storage system and to reserve a trench or an inlet hole.
The holes reserved for the foundation of the equipment and the holes in the bottom of the
equipment for incoming wires should be blocked.
The foundation is made according to the foundation plan provided by SOFAR, or the
foundation plan confirmed by our company, and the tolerance of the upper surface of the foundation
is required to be ±3mm.
4.2.2 Requirements for installation space
In order to ensure that the air inlet can be better air intake and maintenance, it is recommended
to reserve enough space around the box installation position, the minimum space requirement is
shown in the figure below: