Figure 5.29 Schematic diagram of CSU communication network cable connection
Step 1 Pass the communication network cable through the signal inlet hole at the bottom of the
energy storage cabinet, and after passing through the PG header at the corresponding position of the
liquid-cooling compartment of the energy storage cabinet, lead it to the corresponding wiring position
of the auxiliary power module according to the cable identification.
Step 2 Cut off any excessively long cables with a network cable cutter.
Step 3 Use the network cable clamp to crimp the crystal head to the network cable, the network
cable wire sequence at both ends of the uniform 568A standard or 568B standard can be.
Step 4 After crimping is complete, insert the crystal head into the RJ45 port of the Auxiliary
Power Module.
Step 5 After the wiring is completed, gently tug on the cable to ensure that there is a margin, the
corresponding PG header must lock the cable, and tie up the communication network cable according
to the alignment path.
5.9 Operations after cable wiring
After all cable wiring has been made, the following operations are also required:
Use fireproof and waterproof materials to tightly seal the outlet holes and gaps around the energy