Step 6
Take out the front and rear sealing plates of the base from the kit and rear sealing plates and
lock them into place on the base.
Figure 4.12 Schematic diagram of the installation of the front and rear sealing plate
4.3.4 Fixed operation of cabinets connection scheme
Step 1
After making sure that the energy storage cabinet has been installed in the preset position, remove
the long fixing angle piece shipped with the box, attach one end of the fixing angle piece to the
mounting holes on the base of the energy storage cabinet and lock the screws.
Step 2
The locked fixed corner piece is taken as the positioning part, and as a reference, lift the battery
cabinet along the direction of the positioning piece, so that the battery cabinet can fully fit the energy
storage cabinet and the fixed corner parts, and complete the lifting.
Step 3
Repeat step 2 above to secure the energy storage system sequentially using the remaining angles
after all battery cabinets have been lifted to the place.