PowerMagic 400V C&I Energy Storage System User Manual
4.3.2 Check before installation
Inspection of deliverables
Check the completeness of the deliverables against the accompanying packing list.
Inspecting equipment
⚫ Check whether the cabinet actually received is consistent with the ordered model.
⚫ Inspect the energy storage system and internal equipment to ensure that there is no damage,
such as holes, cracks, or other signs of possible internal damage.
⚫ If you find a problem or have questions or if the unit model does not match, contact your
dealer.
4.3.3 Installation and fixing work
⚫ Only a complete energy storage system without any damage can be installed!
Prerequisites:
⚫ Before installation, make sure that the crane, sling, forklift, etc. meet the load-bearing
requirements;
⚫ Preparation of steel cables for lifting has been completed;
⚫ Foundations have been constructed as required;
⚫ Meet the weather requirements for lifting and forklift transport; when installing outdoors,
lifting work should be stopped in case of bad weather conditions, such as heavy rain, fog, strong winds,
etc.
Installation considerations:
Table 4.3 Precautions for Installation of Energy Storage System