EasyManua.ls Logo

SolarEdge SE6000H

SolarEdge SE6000H
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5: Activating, Commissioning and
Configuring the System
You can connect communication options at this stage, as described in
Setting Up
Communication to the Monitoring Platform
on page 49.
After completing all connections, activate and commission the system using the
inverter SetApp mobile application. You can download the SetApp from the Apple App
Store and Google Play before arriving at the site.
Internet connection is required for the download and for the one-time registration, but
not required for using the SetApp.
Step 1: Activating the Installation
During system activation, a Wi-Fi connection is created between the mobile device and
the inverter and the system firmware is upgraded.
Before activation
Download, register (first time only)and log-in to SetApp on your mobile device.
Internet connection is required for the download and for the one-time registration.
Verify that the application is updated with the latest version.
If applicable, turn on all devices (battery, Energy Meter) connected to the inverter,
so that the devices may be auto-detected.
To activate the inverter:
1. Turn ONthe ACcircuit breaker on the main distribution panel.
2.
Move the Connection Unit (if applicable) switch to the ON position.
3.
Open SetApp and follow the on-screen instructions.
Chapter 5: Activating, Commissioning and Configuring the System 35
EV Charging Single Phase Inverter Guide MAN-01-00583-1.5

Table of Contents

Other manuals for SolarEdge SE6000H

Related product manuals