Chapter 4: Auto-transformer and Backed-up
Loads Panel Installation (for Backup)
The auto-transformer is used for backup power only, and is not mandatory if using
Smart Energy Management applications only. Refer to the table on page 16.
The auto-transformer connects to the AC side of the inverter. Since the inverter AC
connections are on its right side, it is recommended to position the auto-transformer to
the right of the inverter to simplify wiring.
StorEdge Solution with Backup MAN-01-00262-1.5
40 Chapter 4: Auto-transformer and Backed-up Loads Panel Installation
(for Backup)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge StorEdge Solution with Backup and is the answer not in the manual?

SolarEdge StorEdge Solution with Backup Specifications

General IconGeneral
BrandSolarEdge
ModelStorEdge Solution with Backup
CategoryInverter
LanguageEnglish

Related product manuals