EasyManua.ls Logo

SolarEdge StorEdge Solution with Backup

SolarEdge StorEdge Solution with Backup
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 9: Setting Up Communication to the
Monitoring Platform
The inverter sends the following information to the monitoring platform:
Power optimizer information received via the DC power lines (the PV output circuit).
inverter information
Information of any other connected devices.
This chapter describes setting up communication between:
The inverter and the monitoring platform through the Internet (wired/ wireless), or
through a cellular connection.
Multiple inverters for a master/slave configuration.
Communication setup is not required for power harvesting, however it is needed for
using the monitoring platform.
CAUTION!
When connecting the communication cables, make sure that the ON/OFF
switch on the StorEdge Connection Unit is turned OFF, and the AC is turned
OFF.
When configuring the communication parameters, make sure that the ON/OFF
switch on the StorEdge Connection Unit is OFF, and the AC is turned ON.
ATTENTION!
Lors de la connexion des câbles de communication, assurez-vous que
l'interrupteur MARCHE/ARRÊT à la base de l'onduleur soit en position ARRÊT,
et le CA est en position ARRÊT. Lors de la configuration des paramètres de
communication, assurez-vous que l'interrupteur MARCHE/ARRÊT soit en
position ARRÊT, et le CA est en position MARCHE.
StorEdge Solution with Backup MAN-01-00262-1.5
96 Chapter 9: Setting Up Communication to the Monitoring Platform

Table of Contents

Related product manuals