NOTE
The inverter RS485 bus should be connected to the battery and
meter. Connecting multiple inverters with RS485 master-slave
connection may require an RS485 Plug-in (available form
SolarEdge; Refer to http://www.solaredge.com/files/pdfs/RS485_
expansion_kit_installation_guide.pdf).
For communication connection refer to
Connecting Communication to the Meter
on
page 66.
StorEdge Solution with Backup MAN-01-00262-1.5
44 Chapter 5: Meter Installation