Document No: 9961 FIssue Date: Jan-29-2018 Page 19 of 35
This document and all copies are the property of Spider
®
. All dimensions and data are indicative only.
The user must ensure that the equipment complies with local rules and regulations.
= Inspect
= Verify
= Perform process
Push the primary suspension wire rope
through the wire rope insertion point approximately
15 inches.
Operate the hoist in the UP direction while
pushing the rope into the hoist.
Ensure the wire rope runs freely through the
wire rope exit guide.
Push secondary wire rope through the wire rope
insertion point for the secondary rope until it exits
the hoist.
Attach a 25 lb (11.5 kg) weight to the end of the
secondary wire rope to assist secondary wire rope
travel.