Page 26 of 35 Document No: 9961 Revision: F Issue Date: Jan-29-2018
This document and all copies are the property of Spider
®
. All dimensions and data are indicative only.
The user must ensure that the equipment complies with local rules and regulations.
= Inspect
= Verify
= Perform process
To prevent hoists and platform from tipping and avoid injuries, ensure that the platform is properly
suspension wire rope.
Push in the DOWN operation button to wind the primary suspension wire rope out of the hoist.
To remove the last 15 inches (40 cm) of wire rope, if necessary, grab the wire rope above the insertion
point, hold the overspeed brake reset knob in the reset position (vertical) and slowly pull the primary
suspension wire rope out of the hoist.
Verify hoist is secure in the stirrup mount prior to applying slack in the primary suspension
wire rope. In order to remove the secondary suspension wire rope, there must be no slack on the
Remove the counterweight from the end of the secondary suspension wire rope.
Pull the secondary suspension wire rope out of the hoist by hand.
If necessary, the primary suspension wire rope can now be removed from the hoist.
®
service center for periodic maintenance at least
once a year from the date it was placed into service.
More frequent service may be required if the hoist is subjected to dirty environments.
If the hoist fails any inspection or operation, it should be returned for service.