Introduction Waukesha Cherry-Burrell
Page 8 95-03009 10/2010
Introduction
Manual Content Maintenance procedures in this manual do not cover aseptic or high pres-
sure pump applications. These are covered in special addendums avail-
able from your Waukesha Cherry-Burrell representative.
Receiving Your Pump All ports are covered at the factory to keep out foreign objects during tran-
sit. If the covers are missing or damaged, thoroughly inspect the fluid
head
, by removing the pump cover (if applicable). Be sure that the pump-
ing head is clean and free of foreign material before rotating the shaft.
Each Wauk
esha pump is shipped completely assembled, lubricated, and
ready for use. Make sure you review “Operation” on page 30 before oper-
ating your pump.
Receiving and Inspection
1. WCB equipment is inspected prior to shipment. When leaving the fac-
tory, it is well-crated for normal transportation procedures. WCB can-
not, however, guarantee safe arrival. Therefore, upon receipt of this
equip
ment, check the received items against the packing list for dam-
aged or missing parts. Check the packing material thoroughly for
small parts.
2. Visually inspect for damage or loss. Immediately report any damage
or l
o
ss to the delivery carrier while present. Following the immediate
notification of the lost or damaged parts, make a claim against the
carrier including a detailed description of the loss or damage, and a
cash value. WCB's responsibility terminates F.O.B. point of manufac-
ture unless otherwise specified per the General Terms and Condi-
tions of Sale as published by WCB and amended from time to time.
Contac
t WCB Order Servic
es if shipping information is required for
handling claims.
See also “Shipping Damage or Loss” on page 5.