WPF 5 (S), WPF 7 (S), WPF 10 (S), WPF 13, WPF 16
Brine/water heat pump
Operating and installation instructions
Index
1. Operating instructions
for users and contractors 2
1.1 Equipment overview
1.2 Equipment description 2
1.3 Important information 3
1.4 Operation 3
1.5 What to do if ...? 3
1.6 Maintenance and care 3
1.7 Operating / installation instructions 3
1.8 Adjustments 4
1.9 Remote control FE 7 13
1.9 Remote control FEK 13
2. Installation instructions
for contractors 14
2.1 Equipment layout 14
2.2 Accessories 14
2.3 Special accessories 14
2.4 Specification 15
2.5 Operation and control 20
2.6 Maintenance and cleaning 20
2.7 Equipment description 20
2.8 Instructions and regulations 20
2.9 Installation 20
2.10 Power supply 23
2.11 Commissioning 32
2.12 Commissioning (contractors) 34
2.13 Commissioning (details) 34
2.14 Troubleshooting 41
2.15 Commissioning list 43
Commissioning report 44
Guarantie 47
The installation (water and electrical) and commissioning, as well as the maintenance of this equipment, must only be carried out by an au-
thorised qualified contractor, in accordance with these instructions.
26_03_01_0189