EasyManua.ls Logo

Stoll CMS 502 - Assembly and Setting Up

Default Icon
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
42
7 Assembly and setting up
Preparing assembly
Assembly and se tting up
7 Assembly and setting up
Preparing assembly
7.1 Preparing assembly
Preparing installation location
7.1.1 Preparing installation location
Installation location The installation location of the knitting machine must fulfill the following
conditions:
flat, firm surface in a building
sufficient space between the knitting machines for
O
perating the machine
Removing the fabrics from the machine
do not put up the machine underground
Having to ols and aids rea dy
7.1.2 Having tools and aids ready
The knitting machine is delivered packed in one of the following ways:
on a transport base packed in film
on
a transport base packed in a c
rate
The following tools and aids are require
d for all types of packing:
Accessories for knitting machine
W
ashers for machine feet
Grub screws for aligning the machine
Square spanner for opening the rear m
achine panel.
Tool
Spirit level

Table of Contents

Related product manuals