EasyManua.ls Logo

Stoll CMS 502 - Machine Transportation and Unpacking

Default Icon
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
43
Assembly and setting up
7
Assembling machine
Transporting machine to installation location
7.1.3 Transporting machine to installation location
DANGER
Heavy knitting machine!
Danger of injury for persons and damage of the knitting
machin
e.
Country-specific regulations for the prevention of
industrial accidents for the tran
sport of heavy loads
are to be observed.
Use on
ly appropriate means
of transport with
sufficient load capacity for transporting and installing
the knitting machine (e.g. fork lift).
T
he relevant country-specific laws and regu
lations
are to be observed when transporting with a ground
conveyor (e.g. fork lift).
Gr
ound conveyor: observe the safety instructions of
the ma
nufacturer.
Transport the machine always with the utmost
cautio
n and care.
All transport locks are to be attached to the machine.
Tr
ansport the knitting machine to the installation location in its
packing and
remove the packing there.
Unpacking knitting machine
7.1.4 Unpacking knitting machine
1. When delivered in a crate: Remove crate lid and side walls.
2. Remove boxes with accessory parts from the fabric collection chamber
.
Assembling machine

Table of Contents

Related product manuals