EasyManuals Logo

SunSynk SYNK-7K-SG05LP1 User Manual

SunSynk SYNK-7K-SG05LP1
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
ECCO SG05LP1 | User Manual17
Function Port Denition
ON
1 2
ON
1 2
Batt Temp
Sensor
CT Coil
L N
BT: battery temperature sensor for lead acid
battery.
HM: current transformer for "zero export to
CT" mode.
GV/GS: dry contact signal for startup the
diesel generator.
When the "GEN signal" is active, the open
contact (GV/GS) will switch on (no voltage output). If the “Signal ISLAND MODE” is ticked, the GS
port will be the dry contact signal for startup the diesel generator.If "Signal ISLAND MODE"
is not ticked, the GV port will be the dry contact signal for startup the diesel generator.
DIP switch: Parallel communication resistor
If the number of inverters in the parallel system
is less than or equal to 6, all inverter’s DIP
switch (1&2) need be ON position.
If the number of inverters in parallel system
exceeds 6, the main 6pcs inverter’s DIP switch
needs to be ON position. And the other
inverter DIP switch (1&2) needs to be OFF position.
B HM G-V
G-S
T
Gen start-up
N/O Relay
GV/GS
(diesel generator startup signal)
relay
coil
open
contact
G V/S
RS 485
parallel_1 parallel_2
BMS 485/
CAN
DRMs
RS 485: RS485 port for energy meter
communication.
BMS 485/CAN: 485/CAN port for battery
communication.
DRMs: for Australia market only.
Parallel 1: Parallel communication port 1
(CAN interface).
Parallel 2: Parallel communication port 2
(CAN interface).
ON
1 2
DIP Switch
Inverter

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SunSynk SYNK-7K-SG05LP1 and is the answer not in the manual?

SunSynk SYNK-7K-SG05LP1 Specifications

General IconGeneral
BrandSunSynk
ModelSYNK-7K-SG05LP1
CategoryInverter
LanguageEnglish

Related product manuals