21.2 Commissioning Record
Company
Our reference
Client Date SO No.
Plant Project/Air handling unit Subject No.
Plant address Type/Size Program version:
Filter calibration done
Time sw. clock, current time set
Other controls
Settings – time channels (scheduling), time switch clock
Channel Operating mode Times Week day
1 Low High : : :
2 Low High : : :
3 Low High : : :
4 Low High : : :
5 Low High : : :
6 Low High : : :
7 Low High : : :
8 Low High : : :
Settings – year channel (scheduling), time switch clock
Channel Operating mode Times Period
1 Inactive Stop High Low
: : / /
2 Inactive Stop High Low
: : / /
3 Inactive Stop High Low
: : / /
4 Inactive Stop High Low
: : / /
5 Inactive Stop High Low
: : / /
6 Inactive Stop High Low
: : / /
7 Inactive Stop High Low
: : / /
8 Inactive Stop High Low
: : / /