ELECTRICAL SYSTEM - Electrical Box
5. Pump Relays: Switch high voltage onto the pump motors. Relay wiring includes a noise-reducing
snubber (large light-blue object) connected in parallel with pump leads.
6. Element Breaker: Disconnects voltage from all heang elements.
7. Electronics Power Switch: Turns the machine o and on. If the machine is plugged into an electri-
cal source, the switch will be illuminated when in the “On” posion.
8. Conduit Tube: Protects power and signal lines from abrasion and other damage. (Not Shown)
9. Main Electronics Board, MVP: Controls all automated systems throughout the machine.
10. Round Ribbon Cable: Connects the hand held display to the Main Electronics Board.
11. Level Probe Wires and Connectors: Connect level probes to power board and ground.
12. Temperature Probe Connecons: Connect temp probes to display board.
13. Steam Tank Element Relays: Switch high voltage onto the steam tank heang elements.
14. Heat Sink: Fanned Aluminum Block: Dissipates heat produced by the element relays. Located on
lid. Sealed with silicon to protect against water penetraon.
15. Flow Meter Wires: Main Electronics board to Flow Meters