WARRANTY & WATER STANDARDS
Synesso’s liability is limited to the purchase price of the product and shall not be held liable for damages that
extend beyond the product itself. Synesso’s liability of consequenal, incidental damages, indirect or direct
damages for personal injury, inability to properly use this product, loss of business prots or interrupon to
business is expressly disclaimed.
** Regarding equipment sold or residing outside the United States: purchaser maybe required to pay for the
shipping and associated costs for warranty parts, repairs and services. Please contact your local distributor to
resolve the issue regionally, if possible.
To maintain the 1 year warranty, an authorized or cered espresso service representave
must perform the installaon of this espresso machine.
Site Preparaon - See Diagram p.9
The machine must be placed on a level horizontal surface that can be easily cleaned and is capable of sus-
taining a minimum of 300 lbs.
The counter top requires a depth of 28”, which provides a minimum clearance of 1” behind and 3” in front
of the machine.
Make a 2 ½” minimum diameter hole through the counter top located 4” from the rear and 7” from the right
side of the machine. The hoses, drain tube, and electrical lines will all pass through this hole.
A 3/8” min. diameter cold water supply line from the lter with a shut o valve is required within 5’ of the
machine. The valve should be easily accessed for machine service.
The machine supply hose and pump ngs are 3/8” tube compression ngs.
A proper water ltraon or soening system must be installed on the incoming water supply. Water treat-
ment requirements will vary, and it is important to use a system designed to match the needs of your spe-
cic area. Water ltraon systems require periodic maintenance, including cartridge or lter replacement.
Proper ltraon and service is vital to the funcon of the machine and the quality of the espresso served.
Follow the instrucons provided by your water treatment system for proper installaon.
Note: Improper water ltraon can result in severe damage to the machine including scale deposits and cor-
rosion. DAMAGE CAUSED BY IMPROPER WATER TREATMENT WILL NOT BE COVERED BY THE MACHINE
WARRANTY. See page 7.
There must be adequate room under the counter to locate each motor and pump. The pumps must be easily
accessible for adjustment and motors must have a minimum of 3” clearance on all sides for air ow.
A oor drain or sink must be available. The best locaon is directly under the machine. The 3/4” drain hose
should descend as vercally as possible for opmal drainage. An air gap is required between the end of the
drain hose and the highest water posion of a clogged drain. This is to prevent the possibility of drain water
backing up into the machine.

Other manuals for Synesso MVP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Synesso MVP and is the answer not in the manual?

Synesso MVP Specifications

General IconGeneral
BrandSynesso
ModelMVP
CategoryCoffee Maker
LanguageEnglish

Related product manuals