5-9
PINCH
ROLLER
PRESSURE
Specifications:
Take-up:
500
g
+20
g
(16.9
oz.
to
18.3
02.)
Supply:
250g
+20
g
(8.1
0z.
to
9.5
oz.)
NOTE:
Explanation
in
this
section
can
be
applied
to
both
left
and
right
pinch
rollers
though
only
the
right
one
is
illustrated.
1.
Switch
on
POWER.
2.
Place
the
deck
in
the
play
mode
with
no
tape
loaded.
To
do
this,
refer
to
5-2,
steps
2
to
3.
3.
Hook
the
spring
scale
to
the
pinch
roller
shaft.
4.
Gently
draw
the
pinch
roller
away
from
the
capstan
shaft
in
a
direction
directly
downwards
until
the
capstan
shaft
and
the
pinch
roller
are
completely
separated.
5.
Gradually
return
the
scale
back
until
the
pinch
roller
just
begins
to
rotate.
The
scale
should
then
be
reading
approx.
500
g
+20
g
(16.9
oz.
to
18.3
oz.)
as
the
value
of
the
take-up
side
pinch
roller
(right)
and
approx.
250
g
+20
g
(8.1
02.
to
9.5
oz.)
as
the
value
of
the
supply
side
pinch
roller
(left).
6.
If
the
reading
is
out
of
the
specified
range,
adjust
the
tension
of
the
pinch
roller
spring
by
bending
the
tab
of
the
pinch
roller
ass’y
in
the
direction
specified
by
the
arrow,
Stronger
Weaker
T-1353-1
Fig.
5-17
Pinch
roller
pressure
adjustment
5-10
ADJUSTING
HEIGHT
OF
PINCH
ROLLER
GUIDES
AND
REC
&
PLAY
HEAD
1.
Load
the
check
base
plate
jig
in
the
cassette
holder.
.
Attach
the
tip
of
the
guide
height
check
jig,
resting
the
check
base
plate
jig,
under
the
pinch
roller
guide
as
illus-
trated
in
Fig.
5-18,
keeping
a
reasonable
distance
from
the
capstan
shaft
in
order
not
to
scratch
the
shaft.
3.
Using
this
jig,
adjust
the
height
of
the
guide
by
turning
the
height
adjusting
screw.
Be
careful
not
to
scratch
the
tape
driving
surface
of
the
guide.
Make
this
adjustment
for
both
right
and
left
pinch
rollers.
4.
Move
the
height
check
jig
into
proximity
with
the
front
surface
of
the
REC
&
PLAY
head.
5.
Carefully
adjust
the
two
height/azimuth
screws
until
the
tip
of
the
jig
just
fits
under
the
tape
guide
of
the
head
as
shown
in
Fig.
5-20.
6.
At
this
time,
adjustment
should
be
done
with
the
head
parallel
to
the
slide
base
(as
far
as
possible).
iw)
16
Guide
Height
Check
Height
Adjusting
Jig
Check
Base
Plate
Jig
Pinch
Roller
Guide
T-1486
Fig.
5-18
Pinch
roller
guide
adjustment
Tape
Guide
Slide
Base
T-1485
Fig.
5-19
Tape
guide
adjustment
Height
/Azimuth
Screws
Tape
Guide
T-
1478
Fig.
5-20
Height
azimuth
screw
location

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Teac C-1 and is the answer not in the manual?

Teac C-1 Specifications

General IconGeneral
BrandTeac
ModelC-1
CategoryCassette Player
LanguageEnglish

Related product manuals