EasyManua.ls Logo

Tecnam P2010 - Page 173

Tecnam P2010
587 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 8 - 5
Section 8 GROUND HANDLING & SERVICE
AIRCRAFT INSPECTION INTERVALS
2
nd
Edition, Rev. 0
2. AIRCRAFT INSPECTION INTERVALS
Scheduled inspections must be performed in accordance with the instructions
addressed on the Aircraft Maintenance Manual. Independently from the aircraft
flight hours, an annual inspection has to be performed.
All required inspections are reported in the Aircraft Maintenance Manual.
As far as the scheduled/unscheduled engine maintenance is concerned, refer to
the engine manufacturer Maintenance Manual.
CAUTION
Unscheduled inspections/maintenance tasks are necessary
when one or more of following conditions occur:
1. Emergency landing
2. Breaking / damage of propeller (or in case of
simple impact)
3. Engine fire
4. Lighting damage
5. Any type of damage or failure

Table of Contents

Other manuals for Tecnam P2010

Related product manuals