3-27
PUMP Wiring Diagram for Pressure sensor of Voltage Type:
Single Pump:
L510s Single Pump Operation
Operation Switch
+
-
Pressure
Converter
14-01 = 0 (Single Pump)
10-01 = 1 (Feedback Source: AVI)
00-02 = 1 (Control Circuit Terminal)
04-00 = 1 (0~10V)
TM2
RA RB COM S1 S2 S3 S4 S5 10V AVI ACI AO AGND
Multi-Pump:
+
-
L510s Multi-Pump: Master L510s Multi-Pump: Follower 1
L510s Multi-Pump: Follower 2 L510s Multi-Pump: Follower 3
Operation
Switch
Pressure
Cobverter
CON2
TM2
CON2
TM2
CON2
TM2
CON2
TM2
AB
AB
AB AB
14-01=1 (Master); 10-01=1(Feedback Source: AVI)
00-02=1 (Control Circuit Terminal)
04-00=1 (0~10V)
14-01=1 (Follower 1); 10-01=1(Feedback Source: AVI)
00-02=1 (Control Circuit Terminal)
04-00=1 (0~10V)
14-01=1 (Master); 10-01=1(Feedback Source: AVI)
00-02=1 (Control Circuit Terminal)
04-00=1 (0~10V)
14-01=1 (Master); 10-01=1(Feedback Source: AVI)
00-02=1 (Control Circuit Terminal)
04-00=1 (0~10V)
RA RB COM S1 S2 S3 S4 S5 10V AVI ACI AO AGND
RA RB COM S1 S2 S3 S4 S5 10V AVI ACI AO AGND
RA RB COM S1 S2 S3 S4 S5 10V AVI ACI AO AGND
RA RB COM S1 S2 S3 S4 S5 10V AVI ACI AO AGND
Notes:
1. It is required to reconnect after setting Master and Slave.
2. It is required to short the COM and AGND port of frame3 and frame 4 when pressure
converter connected with +24Vpower supply.
3. When the communication modes is selected to be multiple pumps in parallel
connection, the baud rate setting 09-02 of Master and Slave are required to be
consistent. Refer to parameter 14-31 for the actions in parallel connection modes.