SAFE 2010/MaxiSAFE 2010
INSTRUCTION MANUAL
Page 25 of 35
81-09-IM.doc
• Cut a triangle hole for each of the wires for the cabinet and the decontamination
apparatus and tape carefully around the wires.
• Cut a triangle slit for the dosage of water, formaldehyde and ammonia. The opening must
be carefully taped after use.
5. Start the decontamination apparatus.
6. After ½ an hour, start the ventilator on reduced speed for one hour so the formaldehyde can
be distributed in the cabinet.
7. The decontamination process will run for 8 hours including the neutralisation of the
formaldehyde with ammonia.
8. Dismantle the tent and pack it together in the transportation back and handle it as hazard
waste.
9. End of process.
Table of dosage:
Model Formaldehyde 37 % Water Ammonia 25 %
0.9 30 ml 30 ml 20 ml
1.2 40 ml 40 ml 27 ml
1.5 50 ml 50 ml 33 ml
1.8 60 ml 60 ml 40 ml
Decontamination procedure:
Formaldehyde evaporation 30 minutes
Distribution time 1 hour
Decontamination incl. neutralisation 8 hours
Equipment:
Catalogue number
Tent 0.9 - 1.2 88 832515
Tent 1.8 88 832517
Telescopic bars (4) height to the ceiling: 2020-3450 mm 88 881345
Bar extensions (4) (In the height) 1000 mm 88 881346
Decontamination apparatus 51 890078
Tape TESA 4613 88 804012