Contents
3.7. Replacing the 3,000 and 5,000 L load cells 35
3.7.1. Required parts and tools 35
3.7.2. Preparation 35
3.7.3. Replacement procedures 37
3.8. Replacing the 3,000 and 5,000 L cables and coolant hoses 38
3.8.1. Required parts and tools 38
3.8.2. Preparation 38
3.8.3. Replacement procedures 38
3.9. Replacing the 3,000 and 5,000 L pulleys and pulley cables 38
3.9.1. Required parts and tools 38
3.9.2. Preparation 39
3.9.3. Replacement procedures for pulleys 39
3.9.4. Replacement procedures for pulley cables 42
3.10. Replacing the 3,000 and 5,000 L BPC lift cylinder 43
3.10.1. Required parts and tools 43
3.10.2. Preparation 43
3.10.3. Replacement procedures 43
3.11. Replacing the 3,000 and 5,000 L platform locking mechanism 43
3.11.1. Required parts and tools 43
3.11.2. Prep arati on 4 3
3.11.3. Replacement procedures 45
3.12. Replacing the 3,000 and 5,000 L assembly bottom hub clamp 46
3.12.1. Required parts and tools 46
3.12.2. Preparation 46
3.12.3. Replacement procedures 46
3.13. Replacing the 3,000 and 5,000 L condenser heater 47
3.13.1. Required parts and tools 47
3.13.2. Preparation 47
3.13.3. Replacement procedures 48
3.14. Additional replacement parts and part numbers 51
3.14.1. Installing cable management system 51
3.14.2. Installing foam probe holder 52
3.14.3. Installing BPC tab holders 52
Chapter 4. Recommended spare part inventory 54
Thermo Scientific