TSC 7320 Transfer Switch Controller
PM180 REV 0 23/02/10 Thomson Power Systems
3.6.1. GENERATOR PAGE 20
3.6.2. MAINS PAGE 20
3.6.3. ALARMS PAGE 20
3.6.4. EVENTS LOG PAGE 21
3.6.5. SCHEDULE PAGE 21
3.6.6. PLC INSTRUMENTATION PAGE 21
3.6.7. CURRENT METERING PAGE 22
3.6.8. SYNCHROSCOPE PAGE 22
3.6.9. ABOUT PAGE 22
4. OPERATING INSTRUCTIONS 23
4.1. DISPLAY SCREEN NAVIGATION 23
4.2. ON LOAD TEST INSTRUCTIONS (UTILITY POWER FAIL SIMULATION) 24
4.3. OFF LOAD TEST INSTRUCTIONS (GENERATOR NO LOAD TEST) 24
4.4. OPEN/CLOSED TRANSITION TRANSFER OPERATION 25
4.4.1. Open Transition IN-SYNC Transfer Operation (Model X) 26
4.4.2. CLOSED TRANSITION REANSFER (FAST TRANSFER MODEL 3) 26
4.5. TRANSFER FAIL ALARM RESET 27
4.6. SERVICE DISCONNECT MODE 27
4.7. PHASE SEQUENCE PROTECTION ALARM RESET 27
5. PROGRAMMING INSTRUCTIONS 28
5.1. PASSWORD SECURITY DESCRIPTION/LOGIN 28
5.1.1. NON-RESTRICTED SETTINGS 28
5.1.2. RESTRICTED SETTINGS 29
5.2. SYSTEM TIME/DATE ADJUSTMENT 30
5.3. VOLTAGE CHANGE PROCEDURE 31
5.4. EXERCISE TIMER SETUP 33
5.4.1. ADDING / EDITNG NEW EXERCISE SCHEDULE EVENT 33
5.5. MULTI-STAGE LOAD SHED CONTROL 34
5.6. SYSTEM SETTINGS 35
5.6.1. OPEN TRANSITION 35
5.6.2. MANUAL OPERATION 35
5.6.3. REMOTE OFF LOAD TEST 36
5.6.4. REMOTE ON LOAD TEST 36
6. FACTORY DEFAULT PROGRAMMING 37