EasyManua.ls Logo

Thytronic DMC3S - Page 88

Thytronic DMC3S
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
88
DMC3S - Manual - 08 - 2021
To ensure that the breaker closes in perfect synchronisation, the relay must send the close command
when the phase difference is = 8.6 degrees and V
2
is delayed relative to V
1
.
Functional block (Block3)
If the voltmetric measurement chain fails (function 74VT tripped), the synchronisation control func-
tion is blocked.
- 0.12
- 0.10 - 0.08 - 0.06 - 0.04 - 0.02
- 0,124 - 0,122
0,120
- 0,118 - 0,116
0,120 s
Close command
close angle advance 8.6 °
f1 = 50 Hz
f2 = 50.2 Hz

Table of Contents

Related product manuals