EasyManua.ls Logo

Topcon RL-100 2S - Preparation and Functions; Power Source Connection; Instrument Setup Requirements

Topcon RL-100 2S
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Preparation and Functions
Power Source
Connect the battery according to the battery type purchased.
For charging and battery replacement instructions, see the “Maintaining Power sources” section.
Setting Up Instrument
Set the instrument on a tripod or smooth
surface.
The instrument must be within horizontal ±5
degrees of true level for auto-leveling to
operate.
ES
C
MENU
ENT
R
L-100
2S
X/Y
±5°

Related product manuals