32
Concerning initial operation in a low temperature
When the instrument and remote controller is used in a temperature below -10°C, a warm up
operation of approximately 4 minutes is necessary for the LCD after the power is turned on.
During the warm up operation, no operation is possible except turning the power switch on/off.
The instrument will perform automatic alignment; however, when the automatic alignment has
been completed, the instrument will go into a standby state until the warm up operation is
completed (the rotary head is in a resting state).
After the warm up operation is completed, the instrument and remote controller will function
normally.
During the warm up operation, the instrument will continue the operation even if the
power of the remote controller is turned off. (The instrument will not go into a
standby state.)
When the power is turned off after the warm up operation is completed, the
instrument will begin warm up operation again when the power is back on.
Warm up screen
Approximately
4 minutes later

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Topcon RL-100 2S and is the answer not in the manual?

Topcon RL-100 2S Specifications

General IconGeneral
BrandTopcon
ModelRL-100 2S
CategoryLaser Level
LanguageEnglish

Related product manuals