Erase Schedule
– Reset the selected schedule. e schedule’s status will be set to DISABLED (except for schedule A, it remains
ENABLED) and the schedule TYPE set to WEEKDAYS. All other settings within the schedule will be set to OFF.
Step 1 – While in the ADVANCED/SCHEDULE DETAILS menu, use the Up
or Down arrows to select the Schedule you
want to edit. Press SELECT .
Step 2 – Use the Up
or Down arrows to navigate to ERASE SCHEDULE, then Press SELECT .
ERASE SCHEDULE
ARE YOU SURE? NO
Step 3 – Use the Up or Down arrows to Yes to proceed to erase the schedule or No to cancel, then press SELECT .
Set MV/Pump Delay – Set a wait time between activating the master valve or pump, and activating the rst valve in the schedule.
is delay is usually used to allow the system enough time to build pressure for proper operation, or to ll the irrigation piping system with
water.
Step 1 – While in the ADVANCED/SCHEDULE DETAILS menu, use the Up
or Down arrows to select the Schedule you
want to edit. Press SELECT .
Step 2 – Use the Up or Down arrows to navigate to MV/PUMP DELAY. Press SELECT .
SCHEDULE A
ERASE SCHEDULE
MV/PUMP DELAY 00:10
VALVE DELAY OFF
Step 3 – Use the Up or Down arrows to adjust the delay time as necessary. Press SELECT .
Set Valve Delay – Set a wait time after a valve closes and before another valve is activated. is delay is commonly used when the
system is being fed by a well. e delay allows the well time to recharge. Valve delay can be set with a maximum duration of 30 minutes.
Step 1 – While in the ADVANCED/SCHEDULE DETAILS menu, use the Up
or Down arrows to select the Schedule you
want to edit. Press SELECT .
Step 2 – Use the Up or Down arrows to navigate to VALVE DELAY. Press SELECT .
SCHEDULE A
MV/PUMP DELAY OFF
VALVE DELAY 00:10
MV/PUMP IN DELAY OFF
Step 3 – Use the Up or Down arrows to adjust the delay time as necessary. e delay can be set
between 10 seconds to 30 minutes in 10-second increments. Press SELECT .
Set MV/Pump In Delay – Set whether the master valve or pump is active during valve delays. e default is set to OFF.
Step 1 – While in the ADVANCED/SCHEDULE DETAILS menu, use the Up or Down arrows to select the Schedule you
want to edit. Press SELECT .
Step 2 – Use the Up
or Down arrows to navigate to MV/PUMP IN DELAY. Press SELECT .
SCHEDULE A
MV/PUMP DELAY OFF
VALVE DELAY OFF
MV/PUMP IN DELAY ON
Step 3 – Use the Up or Down arrows to set the MV/Pump In Delay to ON or OFF during valve
delays. Press SELECT .
Note: is function is used when a well needs time to recover between valve openings. For example, a schedule includes Valve 1 and
Valve 2. A VALVE DELAY of 10 minutes has been programmed. Valve 1 opens, irrigates, and closes. e 10 minute Valve Delay begins.
e grower’s desire in this example is for the pump to be o during this 10 minutes before Valve 2 opens to allow the well to recover, so he
would set the MV/PUMP IN DELAY to OFF. is ensures that the MV/Pump relay will be o during the 10 minutes of VALVE DELAY
between Valve 1 and Valve 2.