EasyManua.ls Logo

Toro Outcross 9060 Series - Page 27

Toro Outcross 9060 Series
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AdjustingtheLiftLinks
LevelingtheAttachmentSide-to-Side
Note:Adjustingtheliftlinksaffectstheparameter
settingsforallattachments.Maintaina1cm(3/8inch)
lengthofexposedthread.
1.Loosenthejamnutoneitherliftlink(Figure24).
2.Adjusttheliftlinkinoroutuntiltheattachmentis
level(Figure24).
g308989
Figure24
1.Jamnut
2.Liftlink
3.Tightenthejamnut(Figure24).
AdjustingtheSwayLinks
Note:ChecktheattachmentOperator’sManualfor
adjustingtheswayprocedure.Formostimplements,
asmallamountofsway(13to25mmor1/2to1inch)
isneeded.
Note:IfyouareattachingaCategory1attachmentto
themachine,usetheappropriatespacersandhubs.
1.Removethehairpinandcotterpinoneachsway
link(Figure25).
2.Adjusttheswaylinkinoroutuntiltheimplement
islevel(Figure25).
3.Afteradjusting,securetheswaylinkwiththe
cotterpinandhairpin(Figure25).
g308992
Figure25
1.Hairpin
3.Cotterpin
2.Swaylink
ConnectingtheRear
Power-Takeoff(PTO)
1.Parkthemachineonalevelsurface,movethe
shiftlevertotheNEUTRALposition,engagethe
parkingbrake,shutofftheengine,andremove
thekey.
2.Alignthequick-connectcouplingofthedriveshaft
withtheoutputshaftofthePTO(Figure26).
Note:YoucanrotatetherearPTOenoughto
aidinthesplinealignment.
g250417
Figure26
1.PTOoutputshaft
(machine)
2.Quick-connectcoupling
(driveshaft)
3.Pullbackthelockcollarofthedriveshaftyoke
(Figure27).
27

Table of Contents

Related product manuals