EasyManua.ls Logo

Toro Z Master Z400 Series - Page 94

Toro Z Master Z400 Series
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-7Z Master Z400 Service Manual
5
ENGINE
3. Apply anti-seize compound to the engine shaft (Fig.
231).
Fig 231 PICT-0025c
4. Apply a thread-locking compound to the clutch
retainer bolt (Fig. 232).
Fig 232 PICT-0026c
Fig 233 PICT-0027c
5. Install the hydro pump drive pulley and the electric
PTO clutch with the bolt and spring washers. Torque
the bolt to 55 ft-lbs. (74.6 Nm) (Fig. 233).
Fig 230 PICT-0019c
b. Install the four ground wires in the left rearmost
mounting bolt hole (Fig. 230).

Table of Contents

Related product manuals