4 Replacement Procedures
4-48 Satellite/Satellite Pro U500/U500D, PORTEGE M900/M900D Maintenance Manual
Installing the Touch pad on/off board and Touch pad Bracket
To install the touch pad on/off board and Touch Pad bracket, follow the steps below and refer
to Figure 4-27 and 4-28.
1. Install the Touch pad bracket on the Top case and secure the screws as the following
and paste the tape.
• M2×3.5L FLAT HEAD screw ×3
2. Install the Touch pad on/off board on the top case and secure the screws as the
following, and then paste on piece of tape to fix it.
• M2×3L FLAT HEAD screw ×2