Appendix A: Forms and Check Sheets
The following forms and check sheets are included for use
with Trane start-up of HDWA Agility™ chillers. Forms and
check sheets are used, as appropriate, for installation
completion verification before Trane start-up is scheduled,
and for reference during the Trane start-up.
Where the form or check sheet also exists outside of this
publication as standalone literature, the literature order
number is also listed.
• CTV Form — Installation Completion and Request for
Trane Service (HDWA-ADF003*-EN)
• Settings
• Operator Log
Unit Start-up/Commissioning
Important: Start-up must be performed by Trane or an
agent of Trane specifically authorized to
perform start-up and warranty of Trane
®
products. Contractor shall provide Trane (or an
agent of Trane specifically authorized to
perform start-up) with notice of the scheduled
start-up at least two weeks prior to the
scheduled start-up.