EasyManua.ls Logo

Trane BMSC000AAA011000 - Schedules; Optimal Start;Stop

Trane BMSC000AAA011000
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BAS-SVU025A-EN 29
Schedules
Scheduling forTracer SC is based on the BACnet schedule object implementation. For details, see
BACnet standard 135-2008. Scheduling facilitates the following tasks:
Creating, editing, and deleting schedules
Creating, editing, and deleting calendars and exception schedules
Viewing all effective schedules in a facility
The Schedules page, shown in figure 1, contains four tabs: Active Schedules, All Schedules, All
Exceptions, and All Calendars.
Optimal Start/Stop
Optimal start and stop times can be defined for HVAC schedules. HVAC refers to both Area and
equipment.
The schedule coordinates with the Area application or equipment to calculate when the optimal
start and stop occurs. Optimal start/stop times are based on outside air conditions, space
temperature, and occupied setpoints.
Figure 1. All Schedules (Active Schedules tab shown)

Related product manuals