Installation
RT-SVX36K-EN 53
to overcome the trap losses and assure complete
condensate removal.
40 through 130 Ton units
Utilizes two steam coils stacked together.These two coils
must be piped in a parallel arrangement.The steps listed
below should be used in addition to the previous steps.
Figure 38 illustrates the recommended piping
configuration for the steam coils.
Figure 35. Hot water piping (20 - 75 Ton)
Figure 36. Hot water piping (90 - 130 Ton)