Installazione
Funzionamento
Manutenzione
Unità ad alta precisione Jupiter
Unità a espansione diretta
JDAC / JUAC / JDAV / JUAV / JDWC / JUWC / JDWV / JUWV
Taglie: 0115 – 0125 – 0133 – 0135 – 0150 – 0160
Unità ad acqua refrigerata
JDCC / JUCC / JDCV / JUCV
Taglie: 0020 – 0025 – 0030 – 0040 – 0060
PKG-SVX24B-IT
Installation of the mounting frame
To install the unit on raised ooring using the mounting
frame, carry out the following procedures:
• a exible seal at least 5 mm thick should be tted
between the raised oor panels and the mounting frame
which should also be isolated from the metallic oor
structure;
• position the unit of the mounting frame and x it using
the M8 screw inserts found on the base of the unit.
Installation on ooring which is not raised
Installation on ooring which is not raised can occur without
using bases, but only on upow models (upwards air ow)
with rear or frontal air intake. Installation on this type of oor
does not require any additional operation besides that of
normal positioning.
Installation of the oor stand
To install the unit on the oor stand, carry out the following
procedures:
• position the unit on the oor stand;
• x the unit to the oor stand using the M8 screw inserts
found on the base of the unit.
Opening and removal of the front panel
To open and remove the front panel proceed as follows:
• rotate the closing blocks, as indicated by the arrows,
by one quarter of a turn;
• rmly grip the panel;
• lift and tilt away from the unit until complete
extraction.
JU**
JD**
Base of unit
Floor stand