EasyManuals Logo

Trane Jupiter JDAC Series User Manual

Trane Jupiter JDAC Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #47 background imageLoading...
Page #47 background image
47
Installazione
Funzionamento
Manutenzione
Unità ad alta precisione Jupiter
Unità a espansione diretta
JDAC / JUAC / JDAV / JUAV / JDWC / JUWC / JDWV / JUWV
Taglie: 0115 0125 0133 0135 0150 0160
Unità ad acqua refrigerata
JDCC / JUCC / JDCV / JUCV
Taglie: 0020 0025 0030 0040 0060
PKG-SVX24B-IT
Setting the air ow sensor
The FS differential pressure switch intervenes if the fan (or
one of the fans) stops working.
The factory set point of the FS differential pressure switch
is at 0.5 mbar (= 50Pa).
As the difference in pressure between the suction and
discharge of the fans depends on the air ow, it may be
necessary to set the instruments after installation, checking
that the contact closes when the fans are in operation.
To set the FS pressure switch, carry out the following
procedure:
simulate a fan fault by stopping a fan; check that the
pressure switch intervenes;
if the pressure switch does not intervene, gradually
increase the setting until the pressure switch switches
off:
- using an adjustment screw, set the differential pressure
switch on a scale from 0.5 to 4.0 mbar (from 50 to
400 Pa).
MAINTENANCE
Checks every 3 months
Carry out the following checks every three months:
check the power supply;
check the alarm status;
check the working temperatures;
check the correct operation of the local/remote
controls;
check air lters, eventual cleaning or replacement;
check the efciency of the condensing drain;
check the steam cylinder is clean, replacing it if
necessary.
Checks every 6 months
Carry out the following checks every six months:
repeat these checks on a three-monthly basis;
check and clean if necessary the cooling coil;
check the operation of the humidifier (if present:
see...)
Annual checks
Carry out the following checks annually:
repeat these checks every 6 months
check the varnish and the nuts and bolts
check the hinges, rabbets and gaskets
check the cables and wiring
tighten the terminal blocks
check and reset if necessary the safety device settings
(pressure switches, thermostats, protection devices);
check the operation of the post heating electrical
heaters;
check the ttings, operation and absorption of the fan/s
motor;
check and if necessary reset the regulation devices
setting;
check and if necessary replace the seal of the hydraulic
circuits/s and tighten the unit couplings;
check and reset if necessary the water regulation valve/
valves setting.
repeate six-month checks.
WARNING! Before removing the internal
protection panels, disconnect the power supply
by turning the main isolating switch D5 to
position “O”, then wait until the fans stop and
the electrical heaters cool down.
Setting the dirty lter sensors
The PFS differential pressure switch is set according to
the loss of load dependent on the dirt inside the lters and
the air ow.
The PFS differential pressure switch must be set at 3 mbar
(=300 Pa).
To set the PFS pressure switch, carry out the following
procedure:
gradually cover the surface of the air lter and check
that the pressure switch intervenes when the lter is
about 50-60 % covered;
if the pressure switch does not intervene, gradually
lower the setting, if it cuts in too soon, increase the
setting:
- using a star screw driver, turn the regulation screws
of the pressure switch to the desired value.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane Jupiter JDAC Series and is the answer not in the manual?

Trane Jupiter JDAC Series Specifications

General IconGeneral
BrandTrane
ModelJupiter JDAC Series
CategoryChiller
LanguageEnglish

Related product manuals