EasyManua.ls Logo

Trane TR200 - System Start up

Trane TR200
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NOTE
3.2 Applying Power to 3.3 Basic Operational Programming
conclude the procedures for applying power to the
frequency converter, basic programming, set-up and
functional testing.
3.5 System Start Up
The procedure in this section requires user-wiring and
application programming to be completed. See
6 Application Examples for application set-up information.
The following procedure is recommended after application
set-up by the user is completed.
CAUTION
MOTOR START!
Ensure that the motor, system, and any attached
equipment is ready for start. It is the responsibility of the
user to ensure safe operation under any condition. Failure
to do so could result in personal injury or equipment
damage.
1. Press [Auto On].
2. Ensure that external control functions are
properly wired to the frequency converter and all
programming is completed.
3. Apply an external run command.
4. Adjust the speed reference throughout the speed
range.
5. Remove the external run command.
6. Note any problem.
If warnings or alarms occur, see Chapter 8 Warnings and
Alarms.
TR200 D-Frame Operating Instructions Start Up and Commissioning
BAS-SVX54B-EN
35

Table of Contents

Other manuals for Trane TR200

Related product manuals