EasyManuals Logo

Triton Digital Mixer Shower Installation Guide

Triton Digital Mixer Shower
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
6
Electrical
The installation must comply with BS 7671
‘Requirements for electrical installations’ (IEE wiring
regulations). Make sure metal incoming hot and cold
water supplies to the Digital Mixer Processor unit are
adequately earth bonded.
DO NOT turn on the electrical supply until the
plumbing connections have been completed. Only
then can the electricity be switched on in order to
undertake commissioning. The Digital Mixer Processor
unit must not be operated dry without water.
The Digital Mixer Processor unit MUST be permanently
connected to a 3Amp fused connection unit and be
provided with means for disconnection incorporated
in the fixed electrical wiring in accordance with current
wiring regulations.
A 30mA Residual Current Device (RCD) MUST be
included in the electrical circuit. This may be part of
the consumer unit or a separate unit.
If the Digital Mixer Processor unit is to be installed
within a bath or shower room the electrical installation
MUST conform to Part P Building Regulation
Requirements for Special Locations.
The Digital Mixer Processor unit MUST only be used
with the AC power supply cable provided. If this supply
cable is damaged, it must be replaced by a Triton
engineer or similar qualified persons to avoid a hazard.
Important information

Other manuals for Triton Digital Mixer Shower

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Triton Digital Mixer Shower and is the answer not in the manual?

Triton Digital Mixer Shower Specifications

General IconGeneral
BrandTriton
ModelDigital Mixer Shower
CategoryPlumbing Product
LanguageEnglish

Related product manuals