5.7.2
Dry mortarless installation with square dry mortarless installation kit TQ
□A1
□A
□B1
12,5
a ≥ 10
12,5
Detail Y
W ≥ 115
②
③
④
⑤
①
①
⑥
࿆࿇
Y
⑤
⑥
④
③
࿆
࿇
Fig. 27: Dry mortarless installation with square installation kit TQ
①
UW section, perimeter
②
UA section, perimeter
③
Cover plate
④
Dry wall screw
⑤
Installation kit TQ
⑥
Trim panels
Ⓐ
Installation side
Ⓑ
Operating side
Personnel:
Specialist personnel
Requirements
Performance class EI 90 S
Fire walls with metal support structure and cladding on both sides, W ≥ 115 mm; detailed specification
Ä
on page 37.
≥ 75 mm distance to load-bearing structural elements (≥ 100 mm depending on construction)
200 mm minimum distance between two fire dampers
Duct connection with flexible connector (recommended)
1. Erect the fire wall according to the manufacturer's instructions and create an installation opening
Ä
on page 37
2. Push the fire damper assembly up to the cover plate into the opening.
If the wall thickness is >115 mm, extend the fire damper on the installation side with an extension piece or a
spiral duct.
3. Fix the cover plate with at least four screws (dry wall screws ∅ ≥ 4.2 mm, a ≥ 10 mm) to the perimeter metal
section.
Installation
Fire walls > Dry mortarless installation with square dry mo...
Fire damper Type FKRS-EU 41