YK10-0015-DI-002-03
vi
Inlet / outlet port piping <Mounting>
Check and ensure that any of hazardous energy is blocked before
starting the operation.
Coolant piping <Mounting>
WARNING
Check and ensure that any of hazardous energy is blocked before
starting the operation.
Power Supply wiring <Mounting>
WARNING
Check and ensure that any of hazardous energy is blocked before
starting the operation.
Entitled staff should conduct the wiring operation. Erroneous wiring
work might cause a fire.
Conduct the wiring operation correctly in compliance with laws and
rules concerning the safety (e.g. Fire Defense Law, Electric Equipment
Technology standard, Internal line cord) in the country and region you
use the product.
Ensure to have a correct grounding.
You have a risk of getting electrical shock in case of failure or electric
leakage.
You are recommended further to install a dedicated Leak breaker.
It is imperative to put the overload protection device.
Otherwise it would cause the motor burn out and/or fire.
Decide the electric wire size in consideration of a voltage drop of the
electric wire.
Under normal conditions, use electric wires with a voltage drop within
2% of the motor rated voltage.
Voltage drop calculating formula
√3 × Electric wire resistance (Ω/km) × Wiring distance (m) × Motor
rated current (A) × 10
-3
* For the motor rated current, see "Table 3."
WARNING