EasyManua.ls Logo

Vaisala Optimus OPT100 - Figure 3 Anchoring Holes on the Mounting Stand

Vaisala Optimus OPT100
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Using the assembled mounting stand as the template, mark the locations of the six
anchors on the mounting surface. If the mounting location is at the edge of a concrete
slab, leave at least 10 cm (4 in) clearance to the edge.
mm
[in]
510 [20.08]
140
[5.51]
140
[5.51]
Figure 3 Anchoring holes on the mounting stand
3. Drill holes for the anchors using an impact drill and an 8 mm (.315 in) drill bit. The holes
must be 60 mm (2.36 in) deep.
4. Install the anchors in the holes.
5. Attach the mounting stand to the anchors.
6. Verify that the mounting stand is securely anchored.
7. Attach DGA monitor to the top of the mounting stand.
8. Tighten the screws to 20 Nm tightness.
OPT100 Installation Guide M211857EN-R
22

Table of Contents

Other manuals for Vaisala Optimus OPT100